• This was an SCDOT project that consisted of resurfacing 24 secondary roads throughout Colleton and Dorchester Counties.
  • The project scope involved removing and replacing concrete curb & gutter, sidewalk, and pedestrian ramps, 6” & 8” Full Depth Patching, milling, 2-ft shoulder widening, 12” Cement Modified Recycled Base, and intermediate & surface course paving.
  • A total of 26,000 tons of Hot-Mix Asphalt was placed on the project.

 

 